Currently Progressing
Unknown
Information: Classified
Progress:
- Inner Frame Building = 100% Completed (Snap-fit)
- Skeletal and Material Check = 0% (Seamline, Sprue, Flash removal)
- Blueprint Designing = 25% In Progress (Designing Modification)
- Constructing = 15% In Progress (Making the Modification Parts)
- Parts Modifying = 10% In Progress (Attaching the Modification Parts)
- General System Check = 0% (Priming)
- Defense System Check = 0% (Final Check and Painting)
- Finishing = 0% (Decal and Lining)
- Final Check = 0% (Top Coat)
HG Age AGE-1 Normal
Information: Classified
Progress:
- Inner Frame Building = 0% (Snap-fit)
- Skeletal and Material Check = 0% (Seamline, Sprue, Flash removal)
- Blueprint Designing = 0% (Designing Modification)
- Constructing = 0% (Making the Modification Parts)
- Parts Modifying = 0% (Attaching the Modification Parts)
- General System Check = 0% (Priming)
- Defense System Check = 0% (Final Check and Painting)
- Finishing = 0% (Decal and Lining)
- Final Check = 0% (Top Coat)